SERVICES

Pipeline Pigging


EXPERIENCED - QUALITY & SAFETY - BIG CAPABILITIES


Pipeline Pigs are used during the testing phase to fill pipelines with water and then after completion of the successful hydrostatic test to de-water the pipeline.
Additionally Pigs are used to remove construction debris that may have accumulated during the construction phase of the pipeline. In some cases Pigs will also be used to further clean and dry the pipeline to remove residue moisture, rust, scale and debris in order to meet the minimum Dew Point as required by relevant pipeline construction specifications.

HTP Services have experience in running various types of pigs over long and short distances, of pipe diameters from 50mm to 1200mm.

 Hi-seal BI-DI Pigs
 2 Cup Gauging Pigs
 Brush Pigs
 Magnetic Pigs
 Jetting Pigs
 Geometric Pigs
 ILI Pigs
 Soft foam swab pigs
 Messenger Wire / Rope insertion
 Pig Tracking / Obstruction Locating


NEED A SOLUTION?

Ready to chat to us about your requirements? Call 01978 536 682