EXPERIENCED - QUALITY & SAFETY - BIG CAPABILITIES
Pipeline Pigs are used during the testing phase to fill pipelines with water and then after completion of the successful hydrostatic test to de-water the pipeline.
Additionally Pigs are used to remove construction debris that may have accumulated during the construction phase of the pipeline. In some cases Pigs will also be used to further clean and dry the pipeline to remove residue moisture, rust, scale and debris in order to meet the minimum Dew Point as required by relevant pipeline construction specifications.
HTP Services have experience in running various types of pigs over long and short distances, of pipe diameters from 50mm to 1200mm.
Hi-seal BI-DI Pigs2 Cup Gauging Pigs
Brush Pigs
Magnetic Pigs
Jetting Pigs
Geometric Pigs
ILI Pigs
Soft foam swab pigs
Messenger Wire / Rope insertion
Pig Tracking / Obstruction Locating